  • Client
    Kariangau Gapura Terminal Energi
  • Location
    East Kalimantan
  • Expertise
    Engineering, Procurement and Construction
  • Sector
    Infrastructure

EMILY-1 Project

In 2018, Kariangau Gapura Terminal Energi (KGTE) and Indika Logistics appointed Tripatra to help them in developing a fuel storage terminal in Kariangau, Balikpapan, East Kalimantan. The facility produced fuel products exclusively for ExxonMobil. Tripatra provided EPCC services for jetty design and construction facility including the development of mineral diesel tank, Mobile gasoline tank, fame tank, loading arms, truck loading stations, and import-export jetty for a fuel terminal.

 

The Project scope is related to the design and construction of an import and export jetty for a Fuel Terminal I n Kariangau, Balikpapan, East Kalimantan. The summary of the jetty design and construction is as follows:

  1. Engineering, Procurement, Construction and Commissioning works
  2. Execution of start to finish Design and Construction Project.
  3. It is comprised of facilities for a function Tanker Jetty.

 

Work Included:

  1. Design Execution for Jetty
  2. Procurement and Construction for Jetty Piling
  3. Procurement and Construction for Jetty Upper Structure
  4. Precast Concrete
  5. In situ Concrete
  6. Fenders
  7. Bollards
  8. Quick Release Hooks
  9. Ship Access Gangways
  10. Pedestal Crane
  11. Procurement and Installation of Cathodic Protection
  12. Procurement and installation of Loading Arms, Hose Towers and Davit Cranes
  13. Engineering Scope of Works
  14. Detail Engineering Scope Of Works
  15. Jetty Information
    • Wharf – Quay line platform
    • Approach Trestle Jetty – Trestle structure conneting to jetty head
    • Breasing and Mooring Dolphin Stucture
    • Walkway and bridge
    • Part of previous development
    • Bert for LCT vessel for LCT with LOA